
The Maharashtra government has issued tenders worth ₹4,564 crore for the expansion of Metro Line 5 and the Metro 5A extension, according to reports from Livemint and Thane News. The announcement has been welcomed by Shiv Sena leaders in Kalyan and Ulhasnagar, who described the development as a major Diwali gift for commuters in the region. In Kalyan, KDMC mayor Harshali Chaudhari-Thavil and Shiv Sena city president Ravi Patil welcomed the move, acknowledging the efforts of Deputy Chief Minister Eknath Shinde and Kalyan MP Dr Shrikant Shinde in advancing the project. Patil specifically highlighted that Metro Line 5 was approved in 2016 and Prime Minister Narendra Modi laid its foundation stone in 2018, with construction of the first phase now underway and its trial run beginning on Tuesday.
According to Livemint reports, the planned expansion will take Metro Line 5 beyond Bhiwandi through two additional stretches: Dhamankar Naka-Ranjnoli and Ranjnoli-Bhoirwadi via Durgadi. Under Metro 5A, the proposed corridor will link Bhoirwadi to Kalyan railway station before extending towards Ulhasnagar and the Ambernath region. To address traffic congestion in Bhiwandi, the Dhamankar Naka-Temghar section is proposed to run underground, while the remaining stretches will be developed as elevated corridors. The plan also includes a double-decker structure combining road and metro infrastructure along certain sections.
As reported by Livemint and Thane News, MP Shrikant Shinde announced during a press conference in Ulhasnagar that the Metro 5A corridor would enter Ulhasnagar through Kalyan as a double-decker structure, featuring an elevated road flyover with the metro line running above it. Shrikant Shinde also announced that the contract would be awarded within two months following the issuance of the tender, paving the way for construction activities to begin on the ground. In Ulhasnagar, mayor Ashwini Kamlesh Nikam and other Shiv Sena leaders marked the announcement by bursting firecrackers and distributing sweets.
According to Livemint and Thane News reports, the decision to extend Metro Line 5 towards Khadakpada in Kalyan was particularly significant, as Patil had specifically demanded this extension and was happy that Deputy Chief Minister Eknath Shinde and MP Dr Shrikant Shinde had fulfilled this demand. Once operational, the expanded network is expected to improve travel between Thane, Bhiwandi, Kalyan, Ulhasnagar and Ambernath, providing commuters with an additional travel option and easing pressure on congested roads. The ₹4,564 crore tender release represents a major milestone in the project's development, with construction activities now positioned to begin following the contract award.