
The Ministry of Communications is working on a proposal to roll out a second edition of the telecom production-linked incentive scheme, focusing on design-led manufacturing and higher domestic value addition. According to an official source, the proposal will be sent for inter-ministerial consultation before being submitted for Union Cabinet approval. As reported by ETGovernment, the source emphasized that "Telecom PLI is a work in progress. It has to go for inter-ministerial consultation."
The government had launched the first edition of the telecom PLI scheme with an outlay of ₹12,195 crore, which concluded in March 2026. The scheme demonstrated strong performance, attracting investment of ₹6,073 crore against the target of ₹4,115 crore. According to the official source, 42 companies, including 28 MSMEs, received approvals under the PLI scheme for telecom and networking products, with 17 companies applying for an additional incentive of 1 per cent under design-led manufacturing criteria.
The telecom ministry is prioritizing higher local value addition in India and emphasizing the need for backward integration in design and development. As reported by ETGovernment, the source stated that the government wants the ecosystem to be backward integrated design and development, indicating a shift toward more comprehensive local manufacturing capabilities beyond basic assembly operations.
Simultaneously, the Department of Pharmaceuticals is drawing up a ₹7,000 crore scheme to boost domestic bulk-drug manufacturing, with a proposal to extend production incentives to existing plants and adopt a platform-based approach. According to Business Standard, ₹5,000 crore could be allocated to production incentives, with the remaining ₹2,000 crore directed towards R&D, common infrastructure and capital subsidies. The proposed framework identifies 52 sets of molecules as manufacturing platforms, potentially covering value chains spanning more than 300 intermediates and downstream active pharmaceutical ingredients (APIs).
The proposed bulk drug scheme addresses significant challenges faced by domestic manufacturers, including commercial pressure from Chinese suppliers who sharply reduce prices when new Indian facilities begin production. As reported by Business Standard, the existing bulk-drugs PLI scheme attracted actual investment of ₹5,210.74 crore by June 2026, exceeding the committed investment of ₹4,330 crore, but production stood at about ₹3,270 crore against a lifecycle target of ₹37,378 crore. The new framework includes dedicated ₹500 crore allocation for R&D and ₹2,000 crore for capital subsidies to support continuous-flow equipment and strategic technology adoption.