
Tesla and SpaceX have officially announced that Terafab, their jointly developed advanced chip factory, will be built in Grimes County, Texas, just north of Houston. The companies made the formal announcement Thursday, confirming months of speculation about the massive project. The facility will be "the largest and most valuable building on Earth by far," as stated by Elon Musk, CEO of both companies, in his Thursday post. The companies will make an initial investment of $16.8 billion in the project, with SpaceX alone suggesting potential spending of up to $119 billion across a multi-phase construction plan in company filings. More than 100 million square feet of manufacturing space is planned for the facility, making it significantly larger than existing semiconductor facilities.
The Terafab chip factory will span more than 100 million square feet, making it significantly larger than existing semiconductor facilities. Musk separately confirmed that the site would be roughly 50 times larger than the Pentagon, the headquarters of the U.S. Department of Defense, once finished. Analyst estimates suggest the facility could generate more than one trillion watts of AI computing capacity each year, according to reports from X. The factory will rely on two-nanometer chip technology, among the most advanced processes available today. Terafab will be designed to build new compute at an unprecedented scale and speed, as stated by SpaceX, with the facility housing manufacturing, packaging, and testing of advanced logic and memory devices in one vertically integrated location. SpaceX released several renderings of Terafab on Thursday, featuring a futuristic, Star Wars-like roadway attached to what appears to be the factory, which itself is split into four massive, rectangular-shaped buildings.
Terafab will build chips for Tesla's Optimus humanoid robots and Full Self-Driving software, as well as produce space-hardened chips for SpaceX satellites and orbital data centers tied to xAI, Musk's artificial intelligence venture. The project promises at least 3,000 local jobs from Grimes and nearby Brazos County. The facility will be an advanced semiconductor fab that will bridge the divide between current global chip supply and the compute demand of the future, as stated by SpaceX. Musk has stated that existing global chip fabrication covers only about 2% of the compute Tesla and SpaceX expect to need in the coming years. Terafab will produce chips optimized for edge computing and inference for use in hardware like Tesla's Optimus robots and self-driving Cybercabs, along with high-power chips designed for operating SpaceX's space-based data centers.
SpaceX has committed to using water from the local Gibbons Creek Reservoir instead of local groundwater for the project, addressing environmental concerns. The announcement followed a heavily attended county meeting on Wednesday where hundreds of residents attended and raised concerns about millions of dollars in tax breaks awarded to the project, as well as a lack of transparency. Nearly 900 residents of Grimes County signed a petition calling for more community oversight of large AI infrastructure projects, like the Terafab facility, that receive public incentives. SpaceX agreed to pay the county $20 million every year, or about 78% of what it would have paid in property taxes, as stated by SpaceX attorney Bucky Brannen at the meeting. Intel has said it will contribute to the Terafab project, although the company has been cagey about its exact contributions. Bringing these aspects together in one location will enable fast, recursive improvements and accelerate new compute deployed, as stated by SpaceX. Jordan Buss, the senior director of environment, health, safety, and medical for SpaceX, said during the meeting that the factory is essential for the United States to compete in the AI race.