
GE Vernova T&D India Ltd has secured a significant contract from Power Grid Corporation of India for a 6,000 MW transmission link project. According to reports from CNBC TV18, the company emerged as the lowest bidder for this project, as disclosed in a September 7 filing. The company announced this development in a regulatory filing on Saturday, marking a major milestone for the transmission infrastructure sector.
The transmission project involves two 3,000 MW converter stations using Line-commutated converter (LCC) technology and a ±800 kV high-voltage direct current (HVDC) system. As reported by CNBC TV18, GE Vernova T&D India will handle the entire process from design and supply to execution. The Barmer II-South Kalamb transmission corridor is designed to carry renewable electricity from Rajasthan to regions with high electricity demand, with the 6 GW, 800 kV project approved by the National Committee on Transmission in May 2025.
Despite the contract win, GE Vernova T&D shares fell up to 3% on Wednesday, trading at ₹3,922.3, representing a 3.2% decline. According to CNBC TV18, the stock has now trimmed its year-to-date advance to 23%. The market reaction appears to be influenced by broader AI infrastructure concerns, with analysts from Societe Generale warning that a Democrat sweep could impact AI buildout, as GE Vernova is a key contributor to AI infrastructure development.
The stock decline aligns with the broader sell-off in AI trade globally following the US midterm election results. As reported by CNBC TV18, early election trends show Democrats set to take control of the House and Senate, with Nasdaq futures trading with losses of close to 600 points. The market concerns center around potential policy changes that could impact the AI infrastructure sector, where GE Vernova plays a significant role.