
Patel Engineering has emerged as the lowest bidder for a ₹1,441.04 crore contract, including GST, to execute a 144 MW hydroelectric project in Arunachal Pradesh. According to the latest exchange filing dated 26 November 2026, the company received the bid declaration from its wholly owned subsidiary, Dirang Energy Private Limited (DEPL), for the Gongri Hydro Electric Project in West Kameng district. The project comprises two units of 72 MW each and is expected to take 48 months to complete from the date of award. As reported by CNBC TV18, the project will be built under the build-own-operate-transfer (BOOT) model over a 40-year lease period.
The run-of-the-river project is planned on the Gongri River, a tributary of the Bichom River in the Kameng basin, near Dirang town in West Kameng district. The project will be executed by DEPL, a special purpose company formed by Patel Engineering specifically for this project. The construction involves a diversion barrage with four radial gates, intake structures and two desilting chambers, along with a 7.1-km-long tunnel measuring 5.8 metres in diameter to carry water to the powerhouse. The project is expected to generate 623.19 million units of electricity annually, based on 90% dependable water flow and 95% plant availability. According to the regulatory filing, the project includes a 13-metre-diameter surge shaft to regulate water pressure and a 647.26-metre-long pressure shaft, measuring 4.4 metres in diameter, to channel water to the turbines.
Additional components include a surface powerhouse, tail race channel to return water to the river, switchyard and associated hydro-mechanical and electro-mechanical installations. The project will allow Patel Engineering to deploy its engineering capabilities towards a strategic group asset and contribute to renewable power generation in Arunachal Pradesh. The filing confirms that this is a related party transaction as DEPL is a wholly owned subsidiary, though it has been disclosed as being conducted on an arm's length basis.
As reported by CNBC TV18, Kavita Shirvaikar, managing director of Patel Engineering, stated that the project will allow the company to deploy its engineering capabilities towards a strategic group asset and contribute to renewable power generation. Established in 1949, Patel Engineering operates in hydropower, tunnelling and irrigation, having completed more than 85 dams, 40 hydroelectric projects and over 300 km of tunnelling. The company's shares were trading at ₹24.20 on the NSE, up 5.22%, or ₹1.20, following the project announcement. According to the latest filing, the ₹1,441.04 crore contract strengthens Patel Engineering's order book in its core hydropower and tunnelling segment, with revenue recognition spread over the 48-month construction period.