
Union Minister Jyotiraditya Scindia announced that Gwalior is set to host Asia's first dedicated telecom manufacturing cluster, with the project expected to attract ₹5,500 crore in investment and create over 18,000 jobs. According to reports from NDTV Profit, the zone will comprise 24-25 manufacturing units spanning six key telecom production verticals, rather than a single facility, representing a comprehensive industrial ecosystem. Scindia recently toured the proposed site at Shrimant Madhavrao Scindia Counter Magnet City, accompanied by the Department of Telecommunications Secretary and other officials, providing concrete momentum to the project's development.
The zone's first phase has been mapped across roughly 170 acres, split between over 90 acres in SADA and more than 70 acres in the adjoining IT Park. As reported by NDTV Profit, Scindia noted that applicant interest has already outpaced this allocation, prompting officials to explore securing additional land to expand the first phase further. The project originally developed as a Counter Magnet City to ease pressure on Delhi is now being repurposed for this telecom manufacturing focus, with Scindia describing it as a full industrial ecosystem that will attract both domestic and international investors.
The project's foundation was established through a July memorandum of understanding between the Department of Telecommunications and Madhya Pradesh's government under Chief Minister Mohan Yadav. According to NDTV Profit, investor roadshows in August secured ₹3,500 crore in commitments with potential for roughly 14,000 jobs in Delhi, followed by ₹2,000 crore in pledges and an estimated 4,000 jobs in Mumbai. 24 companies have formally applied during the land allocation stage, demonstrating concrete investor interest beyond initial verbal commitments, with Scindia emphasizing that these weren't just verbal assurances but formal applications from interested firms.
The project benefits from significant infrastructure developments, including the roughly 120-km Agra-Gwalior High-Speed Corridor connecting the city to Delhi and northern markets, improved rail connectivity, and an airport built for ₹650 crore in just 16 months. As reported by NDTV Profit, the Madhya Pradesh government has committed an incentive package covering land lease, power, employment and production, along with sustainability-linked benefits, plus a separate Common Testing Lab proposed by the Centre at an estimated cost of ₹500 crore. The city's roughly 25,000 annual engineering graduates provide a ready talent pool for the sector, with Scindia pointing to Gwalior's improving connectivity as a key draw for investors.
Scindia emphasized that the project carries forward Gwalior's original Counter Magnet City vision, with both central and state governments fully committed to supporting incoming investors. According to NDTV Profit, he plans to continue the investment push with a roadshow in Bengaluru on September 22, as the project represents a significant step forward in India's telecom manufacturing capabilities and industrial development strategy. The initiative represents a concrete step forward in Gwalior's transformation from a Counter Magnet City concept to a functioning telecom manufacturing hub with strong government backing and substantial investor interest.